Project Overview

The electrical installation and solar panel project at Didcot Sports Pavilion was part of a wider initiative to modernize the facility and improve energy efficiency. The project included a full electrical system fit-out for the new-build pavilion, as well as the integration of a rooftop solar photovoltaic (PV) system. The goal was to provide safe, reliable electrical infrastructure to support sporting and community activities, while reducing the building’s carbon footprint and long-term energy costs.

Planning and Design Considerations

Early-stage planning involved close coordination with the architectural and mechanical design teams to ensure that electrical infrastructure would be seamlessly integrated into the building fabric. Key considerations included power distribution, emergency lighting and energy monitoring systems. The solar PV system was designed to maximize available roof space and optimize energy yield based on building orientation and shading. Future-proofing and sustainability were central to the design, including the provision for EV charging points.

Installation and Coordination

Electrical installation was carried out in tandem with other construction activities to maintain progress on the overall build timeline. Key components included main distribution boards, internal and external LED lighting, small power, and fire detection systems. The solar PV installation involved secure mounting of panels on the pavilion roof, inverter installation, and connection to the main electrical supply with export metering. Ongoing coordination with the main contractor, local authorities ensured regulatory compliance and smooth commissioning.

Outcome and Client Feedback

The completed installation delivered a modern, energy-efficient electrical infrastructure, with the solar PV system now contributing significantly to the building’s daytime energy needs. The system is also offsetting energy bills and supporting the council’s environmental goals. The pavilion is now a key example of sustainable design in local community facilities.

Client Testimonial:

 

"Thank you for everything you have done to make Fernhill a better place. I can imagine carrying out electrical works in a dementia environment isn't easy, but you have shown such patience, respect and understanding to our residents...love from all the team and residents"

Location: Didcot, Oxfordshire, UK

Project Type: Commercial installation for local community sports pavilion

Client Requirement: Full electrical system fit-out for the new-build pavilion including solar energy

Main Challenge: Ensuring the best outcome for the energy efficiency of the building to serve the local community

Services Provided: Main distribution boards, internal and external LED lighting, fire detection systems and solar PV installation

Outcome: Transforming a community resource to ensure safe, compliant and energy efficient facility

GEC logo

G.E.C. Electrical Contractors Ltd, based in Abingdon, Oxfordshire, offers comprehensive electrical services, including installations, repairs, and renewable energy solutions for residential and commercial clients.

  • Facebook
  • LinkedIn

How can we help?

G.E.C. Electrical Contractors Ltd

  • Trusted Expertise – Safe, high-quality electrical solutions.

  • Fast & Efficient – Prompt service with minimal disruption.

  • Customer First – Clear communication, tailored solutions.

Get In Touch

Tel: 01865 407784

 

Email: admin@gecelectrical.com

 

Address:

Unit 114 Culham no1 Site,

Station Road,

Abingdon

Oxfordshire

OX14 3DA

Registered in England & Wales. Registered company number: 06482910. VAT number: 311545493

Cookie & Privacy Policy|Conditions of Use

bottom of page